Wednesday, May 14, 2008
I've lost my groupmates!!
My group mates decided that my our choice of buildings was too risky and they've decided to do another... and leave me. But, I'm continuing to post on the same blog as aforementioned.
Thursday, May 8, 2008
PROJECT 3 - address change.
From now on most of my posts regarding this project will be found at http://banfactory.blogspot.com/
This allows for all information and team progress regarding the project to be accessed in one position as opposed to an omitted or extracted version on this site.
This allows for all information and team progress regarding the project to be accessed in one position as opposed to an omitted or extracted version on this site.
Wednesday, May 7, 2008
Project 3 info


For our construction project we've decided to model Shigeru Ban's 'Imai Daycare Centre', Odate, Akita, Japan, 2001. So far, we have researched the building, found plans and details, researched materials and construction methods for each element and decided upon a design schedule. We've also allocated responsibility for the detailing of certain elements and decided upon our individual 5X5 areas. The site has been assessed and we have come to a layout resolution that allows for circulation, parking, site elevations and drainage. We are currently at the stage of specifying the required dimensions for structural elements as we are adapting a small scale building to a large scale.
Wednesday, April 23, 2008
Sunday, April 13, 2008
Baptist Union of Victoria
This project by Atelier Wagner Architects for the Baptist Union of Victoria is located on the corner of High St and Blackburn Rd with a total estimated cost of $5,000,000.
The projects structure consists mainly of pre-cast and in-situ concrete, heavy steel and light aluminum. The floor slab and internal columns are made in-situ, while the external skeleton is pre-cast. To brace the metal skeleton that will hold the glass cladding in place, a metal bracing strip has been cast into the external concrete columns allowing for the bolts and fixings to be rendered over, thus hiding them and creating a smooth line between the concrete and glass.
While heavy steel has been used for the window frames, a lighter aluminum has been used for fascia framework, allowing for tighter curves and minimal cost.
Also, the detail of the stairs show how grooves have been left in the edge of the stairs allowing for a metal frame to be inlaid, ultimately melding the two, minimizing the need for a supporting frame for the metal frame; this system also makes for a slender profile of the wall when clad over.
Saturday, April 12, 2008
End Wall of Concrete Factory Detail
Saturday, April 5, 2008
Concrete portal construction
Subscribe to: